-
3 million sets/annual optronics
2012-11-15
This project plans to cover an area of 3.33 hectares with a building area 20,000 square meters, and it mainly builds production workshop, warehouse and various ancillary facilities.
-
Digital water conservancy engineering equipment
2012-11-15
This project plans to cover an area of 66.7 hectares with a building area of 400,000 square meters.
-
150sets/annual vertical pressure filter
2012-11-15
This project plans to build steel structure plant workshop and open-air cross, and newly increase production building area of 30,120 square meters as well.
-
6,000sets/annual digital automation numerical control machine
2012-11-15
This project plans to cover an area of 6 hectares with a building area of 45,000 square meters, and build facilities including workshop, office building and warehouse.
-
20,000sets/annual heavy-duty machinery reducer
2012-11-15
This project plans to build two production lines for special engineering heavy-duty machinery reducer such as engineering excavator, crane and mixer, and four production lines for high-end excavator.
-
Project toward producing 300,000sets/annual light, medium and heavy-duty auto driving axle
2012-11-15
This project plans to cover an area of 300 Chinese acres with a building area of 110,000 square meters.
-
200,000sets/annual purifiers of motor vehicle flue gas
2012-11-15
The project of motor vehicle exhaust gas purifiers mainly involves the deep processing of mineral rare earth sources.